SB 1202 (effective September 1, 2025)

With the implementation of Senate Bill 1202, from the 89th Legislative Session, Regular Session, on September 1, 2025, related to home backup power installations, including solar panels, battery storage systems, and standby generators, we are outlining our permitting requirements to ensure compliance and maintain effective permitting operations related to the newly effective shot-clock.

"Home backup power installations" are defined as electric generating facilities, energy storage facilities, standby systems, and associated infrastructure for one- or two-family dwellings connected at 600 volts or less.

Please note that until the following minimum submittal criteria is provided, your permit(s) will not be processed in for review. Once you have acknowledged and confirmed that all indicated items have been provided during your application process, plan review will commence.

ALL REQUIRED DOCUMENTS SHALL BE SUBMITTED VIA EMAIL TO: solargentpo@pasadenatx.gov AND SHALL INCLUDE THE FOLLOWING INFO IN THE SUBJECT LINE:

Subject: TPO – Solar or Generator – Address of project

SOLAR/GENERATOR FEE SCHEDULE

Building Application Fee $10.00
Miscellaneous Building Permit Fee $40.00
Plumbing Application Fee $10.00
Gas Openings (1-5) $10.00
Gas Turn On (GTO) $25.00
Gas Line 0’-100’
Additional 100’ or portion thereof
$75.00
$35.00
Electrical Application Fee $10.00
Residential Generator (permanent) $75.00
Reconnection Fee $60.00
Temporary Cut-In (TCI) Application Fee $10.00
Temporary Cut-In (TCI) Application Fee $50.00
Meter Loop and Service Permit $25.00
Minimum Permit Fee – Solar $40.00